Case Study
Hutai Textile Cooling Station & Chilled Water Network Retrofit
About 2,000 m² machine room and auxiliary spaces—LOD500 BIM modeling and MEP detailing with clash detection, clearance analysis, coordinated drawings, and BIM animation.
About 2,000 m² machine room and auxiliary spaces—LOD500 BIM modeling and MEP detailing with clash detection, clearance analysis, coordinated drawings, and BIM animation.